Network analysis can help identify the interrelationships between tasks that make up complex processes and establish the most appropriate timing and sequence for their execution. The critical path is the path through the network that requires the longest period of time to progress from start to completion. This is the minimum timeframe necessary to complete the whole project.
Retrospective longest path analysis involves the determination of the retrospective as-built critical path.
This first requires the development of a detailed as-built programme. It is then possible to trace the longest continuous path backwards from the actual completion date to determine the as-built critical path. The incidence and extent of critical delay can then be determined by comparing key dates along the as-built critical path with the corresponding planned dates in the baseline programme. It is then possible to study project records to determine which events may have caused any critical delays identified.
This method only has limited capacity to recognise changes to the critical path during the course of the works.
Ref The Society of Construction Law Delay and Disruption Protocol, 2nd edition, published in February 2017 by the Society of Construction Law (UK).
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.